225 MW Sikalbaha Combined Cycle Power Project, Bangladesh



  • Name of Project : 225 MW Sikalbaha Combined Cycle Power Project, Bangladesh 

    Owner : Bangladesh Power Development Board (BPDB)

    Client : Larsen & Toubro Limited, India

    Capacity : 225 MW

    L&T-S&L’s scope : 

    • Complete Basic and Detail Engineering
    • Site Support Services

    Configuration :

    • One (1) Siemens make SGT 5 2000E Gas Turbines Generators (GTGs)
    • One (1) L&T make Heat Recovery Steam Generators (HRSG)
    • One (1) Siemens make Steam Turbine Generator(STG)

    Key Technical Features :

    • GTGs of capacity 172 MW ISO , using natural gas as primary fuel and Diesel as second fuel
    • HRSGs having dual pressure, natural circulation
    • Axial Flow STG, capacity 85 MW
    • Two pass, single shell Axial Condenser
    • Single phase transformer for both GTG and STG
    • 50m tall Gas Turbine Bypass stack

    Fuel :  Natural Gas and Diesel oil, LPG as start up fuel

    Year of commissioning : 2017