    Name of Project : 90 MW IPCL Co-Generation Power Plant Gandhar, Gujarat, India

    Owner : Indian Petrochemicals Limited, India

    Client : Larsen & Toubro Limited, India

    Capacity : 90 MW

    L&T-S&L’s scope : Complete Basic and Detail engineering services

    Configuration :

    • Two (2) GE make & Brush (U.K.) make LM6000 Aero-derivative Gas Turbines Generators (GTGs)
    • Two (2) L&T make Fresh Air Fired (FAF) Heat Recovery Steam Generators (HRSG)

    Key Technical Features :

    • GTGs of capacity 45.03 MW output each with water injection at site design conditions
    • HRSG of Deltak (U.S.A.) design with supplementary /auxiliary firing with integral deaerator & Induced Draft fan. The steam is generated at two pressure levels viz. High Pressure (HP) steam for export to IPCL & Low Pressure (LP) steam for Vapour Absorption Chiller units.

    Fuel : 

    • The primary fuel for the Gas Turbines is Naphtha with HSD as the startup fuel.
    • HRSG is designed to fire Naphtha under supplementary / auxiliary firing mode
    • Both GTG and HRSG firing system have been modified for Natural gas as primary fuel

    Year of commissioning : 1999