• L&T-Sargent & Lundy
  • L&T-Sargent & Lundy

238.35 MW + 228 TPH IOCL Panipat Naphtha Cracker Project (PNCP) Captive Co-Generation Power Plant, Haryana, India



  •  

    Name of Project : 238.35 MW + 228 TPH IOCL Panipat Naphtha Cracker Project (PNCP) Captive Co-Generation Power Plant at Panipat, Haryana, India

    Owner : Indian Oil Corporation Limited, India

    Client : Larsen & Toubro Limited, India

    Capacity : 238.35 MW + 228 TPH

    L&T-S&L’s scope : Complete Basic and Detail Engineering

    Configuration :

    • Five (5) Hitachi make H-25 Gas Turbines Generators (GTGs) + Provision for One (1) future GTG
    • Five (5) L&T make Heat Recovery Steam Generators + Provision for One (1) future HRSG
    • Two (2) Ansaldo make Utility Boilers (UB’s) + Provision for One (1) future UB
    • Three (3) BHEL make EHNK - 50/90-B1 Steam Turbine Generators (STGs) + Provision for One (1) future STG

    Key Technical Features :

    • GTG capacity 25. 6 MW each
    • STG capacity 36.8 MW each
    • Utility boilers of 406.5 TPH each
    • Multifuel capability viz. Blended Fuel Oil (for UB), HSD ( for GT/HRSG) & RLNG (for UB, GT, HRSG)
    • Multi pressure level steam system with floating header concept and cascading bypass
    • Capable to supply steam to process even in case of equipment upset conditions and blackouts
    • 100% common Deaerator, day tanks for HSD (for GTG and HRSG) and blended Fuel Oil (for UB) and their forwarding pumps, Liquefied Natural Gas (LNG) conditioning skid, stacks and online stack monitoring system

    Fuel : Natural Gas

    Year of commissioning : 2010