2x300 MW Lanco Amarkantak Mega Thermal Power Station, Chhattisgarh, India



  •  

    Name of Project : 2x300 MW Lanco Amarkantak Mega Thermal Power Station at Pathadi, Chhattisgarh, India 

    Owner : Lanco Amarkantak Power Private Limited, India

    Client : Zelan Projects Private Limited, Malaysia

    Capacity : 2x300 MW

    L&T-S&L’s scope : Complete Detail engineering services of all BOP Mechanical systems

    Configuration :

    • Two (2) Dongfang Electric, (China) make Boilers
    • Two (2) Dongfang Electric, (China) make Steam Turbine Generators (STGs)

    Key Technical Features :

    • Boilers having drum type, natural circulation with two pass with single reheat of capacity 1025 T/hr, 17.45 MPA and 540oC
    • STGs of capacity 300 MW each with tandem compound, single reheat, regenerative, condensing, multi-cylinder design and combined HP-IP and separate LP casing

    Fuel : Coal

    Year of commissioning : 2010