• L&T-Sargent & Lundy
  • L&T-Sargent & Lundy

4000 MW Qurayyah Independent Power Project, Saudi Arabia



  •  

    Name of Project : 4000 MW Qurayyah Independent Power Project, Kingdom of Saudi Arabia

    Owner : Hajr Electricity Production Company (HAJR), Kingdom of Saudi Arabia

    Client : Samsung C& T, S Korea /Sargent Lundy, USA

    Capacity : 4000 MW

    L&T-S&L’s scope : Part Basic and Complete Detail Engineering Services

    Configuration :

    • Twelve (12) Siemens make Gas Turbines Generators (GTGs)
    • Twelve (12) BHI make Heat Recovery Steam Generators (HRSGs)
    • Six (6) Siemens make Steam Turbine Generators (STGs)

    Key Technical Features :

    • Two (2) Units each unit having Three (3) Blocks of side-by-side 2x2x1 arrangement
    • Dual fuel, Dry Low NOx GTGs SGT6-5000F of 229 MW rating each
    • Two (2) pressure level condensing STGs of 226 MW rating each
    • Horizontal HRSGs without duct firing at two pressure levels
    • Bypass Deaerator
    • Sea water intake system and Cooling system
    • Electrochlorination system
    • Desalination plant for sea water
    • Turbine inlet chilling system
    • Plant HVAC & Firefighting system

    Fuel :  

    • Primary Fuel: Natural Gas
    • Back-up fuel: Diesel

    Year of commissioning : 2014