• L&T-Sargent & Lundy
  • L&T-Sargent & Lundy

Relocation and space planning for CCPP conversion for 790 MW SCPP plant



  •  

    Name of Project : Relocation of existing equipments and space planning for CCPP conversion for 790 MW SCCP plant

    Owner/Client : International Atlas Energy Sdn. Bhd, Malaysia

    Capacity : 790 MW

    L&T-S&L’s scope : 

    • Efficiency improvement by converting to CCPP
    • Conceptual study and Configuration Study
    • Complete Engineering for relocation of equipment, pipes and cables, etc.
    • Preparation of procurement specification
    • Bill of Material (BOM) generation for the pipes, cables, concrete and steel etc.
    • Planning of space required for pipe rack for steam and power cycle pipes and cables around HRSGs upto STGs
    • Site Supervision

    Configuration : Three (3) Siemens make Gas Turbines (GTs)

    Key Technical Features :

    • Three Siemens V94.3 A Gas Turbine of capacity 264 MW each
    • Siemens Generator rated 310 MVA, 15.75 kV
    • Main Fuel: Natural Gas
    • Backup Fuel: Gas Oil
    • Unit Efficiency: Above 39%
    • Air Cooled CCW and Lube oil Coolers

    Fuel : Natural Gas

    Year of commissioning : Re-commissioned in 2013