Name of Project : 370 MW Amman East Combined Cycle Power Plant at Almanakher, Amman, Jordan
Owner : AES Jordan PSC, Jordan
Client : Doosan Heavy Industries and Construction Co. Limited, Korea
Capacity : 370 MW
L&T-S&L’s scope :
- Complete Basic and Detail engineering for the total plant excluding switchyard
- Pre-commissioning, Commissioning and O&M Manuals
Configuration :
- Two (2) Ansaldo make V 94.2 Gas Turbine Generators (GTGs)
- Two (2) Doosan make Heat Recovery Steam Generators (HRSGs)
- One (1) SPX make Air Cooling Condenser (ACC)
- One (1) Fuji make axial Steam Turbine Generator (STG)
Key Technical Features :
- GTG of capacity 140 MW each, designed to operate on natural gas and light distillate fuel (dual fired)
- HRSG with dual pressure, unfired natural circulation design
- STG of capacity 140 MW
- All Air Cooled Systems including Air Cooled Condensers
Fuel : Natural Gas
Year of commissioning : 2009