• L&T-Sargent & Lundy
  • L&T-Sargent & Lundy

400 MW Bibiyana-III Combined Cycle Power Project, Bangladesh



  • Name of Project : 400 MW Bibiyana-III Combined Cycle Power Project, Bangladesh

    Owner/Client : Bangladesh Power Development Board (BPDB), Bangladesh

    Capacity : 400 MW

    L&T-S&L’s scope : Complete Basic and Detail engineering for the entire EPC of the project

    Configuration :

    • One M701F Gas Turbine (GT) of 285.06 MW from Mitsubishi Hitachi Power Systems (MHPS), Japan
    • One Natural Circulation Horizontal Type HRSG from CMI, Belgium
    • One FK-H130/6.3-50-AX Steam Turbine (ST) of 133.25 MW from Fuji Electric Company, Japan

    Key Technical Features :

    • HRSG having Dual Pressure, Natural Circulation with Integral Deaerator, Horizontal Type, CMI design
    • Two pass, Single Shell, Divided Water Box, Axial type water cooled Condenser
    • STG Auxiliaries like BFP, CEP, DM Transfer Pump, Vacuum Pumps, CCW Pumps, Plate Heat-Exchangers etc.
    • 3x50% Centrifugal type Gas Booster Compressors
    • Balance of Plant including Fuel Gas Conditioning, Water Pretreatment Plant, DM Plant, Effluent Treatment Plant, HVAC, Fire Fighting, etc.
    • Inline, FRP, Film Fill Type, Induced Draft Cooling Tower alongwith vertical CW & ACW pumps


    Fuel : Natural Gas

    Year of commissioning :

    • Open Cycle - 2018
    • Combined Cycle - 2019