Name of Project : 400 MW Bibiyana-III Combined Cycle Power Project, Bangladesh
Owner/Client : Bangladesh Power Development Board (BPDB), Bangladesh
Capacity : 400 MW
L&T-S&L’s scope : Complete Basic and Detail engineering for the entire EPC of the project
Configuration :
- One M701F Gas Turbine (GT) of 285.06 MW from Mitsubishi Hitachi Power Systems (MHPS), Japan
- One Natural Circulation Horizontal Type HRSG from CMI, Belgium
- One FK-H130/6.3-50-AX Steam Turbine (ST) of 133.25 MW from Fuji Electric Company, Japan
Key Technical Features :
- HRSG having Dual Pressure, Natural Circulation with Integral Deaerator, Horizontal Type, CMI design
- Two pass, Single Shell, Divided Water Box, Axial type water cooled Condenser
- STG Auxiliaries like BFP, CEP, DM Transfer Pump, Vacuum Pumps, CCW Pumps, Plate Heat-Exchangers etc.
- 3x50% Centrifugal type Gas Booster Compressors
- Balance of Plant including Fuel Gas Conditioning, Water Pretreatment Plant, DM Plant, Effluent Treatment Plant, HVAC, Fire Fighting, etc.
- Inline, FRP, Film Fill Type, Induced Draft Cooling Tower alongwith vertical CW & ACW pumps
Fuel : Natural Gas
Year of commissioning :
- Open Cycle - 2018
- Combined Cycle - 2019