National Integrated Power Projects (NIPP) – Niger – Delta, Nigeria



  •  

    Name of Project : National Integrated Power Projects (NIPP) -  564.37 MW Calabar SCPP at Cross River State,  451.49 MW Ihovbor SCPP at Edo State &  451.49 MW Sapele SCPP at Delta State of Niger - Delta

    Owner : Niger Delta Power Holding Company, Nigeria

    Client : Toshiba Plant Systems & Services Corporation, Tokyo

    Capacity : 564.37 MW, 451.49 MW, 451.49 MW

    L&T-S&L’s scope : 

    • Basic and Detail engineering services
    • O&M Manuals
    • Pre-Commissioning Manuals

    Configuration :

    • Five (5) GE make Frame 9E Gas Turbine Generators (GTGs) with BOP systems for CALABAR SCPP
    • Four (4) GE make Frame 9E Gas Turbine Generators (GTGs) with BOP systems for IHOVBOR SCPP
    • Four (4) GE make Frame 9E Gas Turbine Generators (GTGs) with BOP systems for SAPELE SCPP

    Fuel : Natural Gas

    Year of commissioning : 2010