Name of Project : 220 MW CCPP Tanir Bavi Barge Mounted Power Plant , Tanir Bavi, Mangalore, Karnataka, India
Owner : Tanir Bavi Power Limited, India
Client : Sargent & Lundy, USA
Capacity : 220 MW
L&T-S&L’s scope : Owner’s engineering services for on-shore and off-shore facilities
Configuration :
- Four (4) IHI- Japan make LM6000PC Gas Turbine Generators (GTGs)
- Four (4) Heat Recovery Steam Generators (HRSGs) supplied by Innovative Steam Technologies Ltd., Canada
- One (1) Steam Turbine Generator (STG) supplied by ABB ENS make, Czech Republic
Key Technical Features :
- GTGs using water injection for NOx control
- HRSGs were dual pressure type once through
- STG was condensing non-reheat type
- Fuel supply connection, controls, electrical switchgear, inlet air chilling equipment, black start diesel generator and transformers
Fuel : Naphtha as primary fuel and high speed diesel oil as start-up & shutdown fuel
Year of commissioning : 2001