L&T-Sargent & Lundy Limited
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Investors
Technical Papers
Careers
News & Stories
Contact Us
News & Stories
Contact Us
  • L&T-S&L
  • Sectors
  • Thermal
  • 2x660 MW Shree Singaji Thermal Power Project (Stage-II), M.P., India

Related Links

  • Thermal
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Contact Us

Registered Office

L&T House
Ballard Estate P.O. Box 278 
Mumbai - 400 001 
Maharashtra, India   

Tel No.: +91-22-6752 5656 
Fax: +91-22-6752 5858 

Investors
Annual Reports
Technical Papers
Careers

Follow Us

  • Copyright & Terms
  • Privacy Policy

© 2026 L&T-Sargent & Lundy Limited. All rights reserved.

WATER TREATMENTWATER TREATMENT

2x660 MW Shree Singaji Thermal Power Project (Stage-II),
M.P., India

Client: Larsen & Toubro Limited

Configuration:

  • Two (2) L&T-MHPS make Boilers
  • Two (2) L&T-MHPS make Steam Turbine Generator (GTGs)

Scope:
Complete Basic and Detail Engineering for the entire EPC of the project

Fuel
Indian Coal 

Year of Commissioning: 2016