Name of Project : 370 MW Amman East Combined Cycle Power Plant at Almanakher, Amman, Jordan

Owner : AES Jordan PSC, Jordan

Client : Doosan Heavy Industries and Construction Co. Limited, Korea

Capacity : 370 MW

L&T-S&L’s scope : 

  • Complete Basic and Detail engineering for the total plant excluding switchyard
  • Pre-commissioning, Commissioning and O&M Manuals

Configuration :

  • Two (2) Ansaldo make V 94.2 Gas Turbine Generators (GTGs)
  • Two (2) Doosan make Heat Recovery Steam Generators (HRSGs)
  • One (1) SPX make Air Cooling Condenser (ACC)
  • One (1) Fuji make axial Steam Turbine Generator (STG)

Key Technical Features :

  • GTG of capacity 140 MW each, designed to operate on natural gas and light distillate fuel (dual fired)
  • HRSG with dual pressure, unfired natural circulation design
  • STG of capacity 140 MW
  • All Air Cooled Systems including Air Cooled Condensers

Fuel : Natural Gas

Year of commissioning : 2009