L&T-Sargent & Lundy Limited
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Investors
Technical Papers
Careers
News & Stories
Contact Us
News & Stories
Contact Us
  • L&T-S&L
  • Sectors
  • Thermal
  • 445 MW Konaseema Combined Cycle Power Plant (CCPP), Andhra Pradesh, India

Related Links

  • Thermal
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Contact Us

Registered Office

L&T House
Ballard Estate P.O. Box 278 
Mumbai - 400 001 
Maharashtra, India   

Tel No.: +91-22-6752 5656 
Fax: +91-22-6752 5858 

Investors
Annual Reports
Technical Papers
Careers

Follow Us

  • Copyright & Terms
  • Privacy Policy

© 2026 L&T-Sargent & Lundy Limited. All rights reserved.

WATER TREATMENTWATER TREATMENT

445 MW Konaseema Combined Cycle Power Plant (CCPP)
Andhra Pradesh, India

Name of Project : 445 MW Konaseema Combined Cycle Power Plant at Devarapalli, Andhra Pradesh, India

Owner : Konaseema Gas Power Limited (erstwhile Konaseema EPS Oakwell Power Limited), India

Client : Larsen & Toubro Limited, India

Capacity : 445 MW

L&T-S&L’s scope : 

  • Complete Basic and Detail Engineering
  • Site Support Services

Configuration :

  • Two (2) Siemens make V 94.2 Gas Turbines Generators (GTGs)
  • Two (2) L&T make Heat Recovery Steam Generators (HRSGs)
  • One (1) LMZ make Steam Turbine Generator(STG)

Key Technical Features :

  • GTGs of capacity 139.43 MW each , using natural gas as primary fuel with dry low NOx burners for emission control
  • HRSGs having triple pressure, natural circulation with integral Deaerator
  • STG with Horizontal split of capacity 155.5 MW downward exhaust with combined IP & LP steam injection straight condensing
  • Two pass, single shell divided water box type Axial Condenser

Fuel : Natural Gas

Year of commissioning : 2010