Name of Project : 2x300 MW Lanco Amarkantak Mega Thermal Power Station at Pathadi, Chhattisgarh, India 

Owner : Lanco Amarkantak Power Private Limited, India

Client : Zelan Projects Private Limited, Malaysia

Capacity : 2x300 MW

L&T-S&L’s scope : Complete Detail engineering services of all BOP Mechanical systems

Configuration :

  • Two (2) Dongfang Electric, (China) make Boilers
  • Two (2) Dongfang Electric, (China) make Steam Turbine Generators (STGs)

Key Technical Features :

  • Boilers having drum type, natural circulation with two pass with single reheat of capacity 1025 T/hr, 17.45 MPA and 540oC
  • STGs of capacity 300 MW each with tandem compound, single reheat, regenerative, condensing, multi-cylinder design and combined HP-IP and separate LP casing

Fuel : Coal

Year of commissioning : 2010