Name of Project : 2x300 MW Lanco Amarkantak Mega Thermal Power Station at Pathadi, Chhattisgarh, India
Owner : Lanco Amarkantak Power Private Limited, India
Client : Zelan Projects Private Limited, Malaysia
Capacity : 2x300 MW
L&T-S&L’s scope : Complete Detail engineering services of all BOP Mechanical systems
Configuration :
- Two (2) Dongfang Electric, (China) make Boilers
- Two (2) Dongfang Electric, (China) make Steam Turbine Generators (STGs)
Key Technical Features :
- Boilers having drum type, natural circulation with two pass with single reheat of capacity 1025 T/hr, 17.45 MPA and 540oC
- STGs of capacity 300 MW each with tandem compound, single reheat, regenerative, condensing, multi-cylinder design and combined HP-IP and separate LP casing
Fuel : Coal
Year of commissioning : 2010