L&T-Sargent & Lundy Limited
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Investors
Technical Papers
Careers
News & Stories
Contact Us
News & Stories
Contact Us
  • L&T-S&L
  • Sectors
  • Water Treatment
  • 2x300 MW Lanco Amarkantak Power Plant Project, Chhattisgarh, India

Related Links

  • Water Treatment
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Contact Us

Registered Office

L&T House
Ballard Estate P.O. Box 278 
Mumbai - 400 001 
Maharashtra, India   

Tel No.: +91-22-6752 5656 
Fax: +91-22-6752 5858 

Investors
Annual Reports
Technical Papers
Careers

Follow Us

  • Copyright & Terms
  • Privacy Policy

© 2026 L&T-Sargent & Lundy Limited. All rights reserved.

WATER TREATMENTWATER TREATMENT

2x300 MW Lanco Amarkantak Power Plant Project
Chhattisgarh, India

Name of Project : 2x300 MW Lanco Amarkantak Mega Thermal Power Station at Pathadi, Chhattisgarh, India 

Owner : Lanco Amarkantak Power Private Limited, India

Client : Zelan Projects Private Limited, Malaysia

Capacity : 2x300 MW

L&T-S&L’s scope : Complete Detail engineering services of all BOP Mechanical systems

Configuration :

  • Two (2) Dongfang Electric, (China) make Boilers
  • Two (2) Dongfang Electric, (China) make Steam Turbine Generators (STGs)

Key Technical Features :

  • Boilers having drum type, natural circulation with two pass with single reheat of capacity 1025 T/hr, 17.45 MPA and 540oC
  • STGs of capacity 300 MW each with tandem compound, single reheat, regenerative, condensing, multi-cylinder design and combined HP-IP and separate LP casing

Fuel : Coal

Year of commissioning : 2010