Name of Project : 360 MW Bheramara Combined Cycle Power Project, Bangladesh

Owner : North West Power Generation Co. Ltd (NWPGCL), Bangladesh

Client : Larsen & Toubro Limited, India / Marubeni, Japan

Capacity : 360 MW

L&T-S&L’s scope : 

  • Complete Basic and Detail Engineering
  • Site Support Services

Configuration :

  • One Gas Turbine M 701F4
  • One MHPS Steam Turbine SRT 35.4
  • One CMI/L&T Heat Recovery Steam Generator (HRSG)

Key Technical Features :

  • CW forebay extended inside the Cooling tower basin
  • High capacity (@ 170 M3/ Hr) Deep well water pumps for 3 COC
  • Gas Booster Compressors in Fuel Gas Supply chain
  • Deaerator working without pegging steam at Full load
  • Combine Cycle Project without a GCB

Fuel :  Natural Gas

Year of commissioning : 2017