L&T-Sargent & Lundy Limited
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Investors
Technical Papers
Careers
News & Stories
Contact Us
News & Stories
Contact Us
  • L&T-S&L
  • Sectors
  • Water Treatment
  • 375 MW Dhuvaran Phase III Combined Cycle Power Project, India

Related Links

  • Water Treatment
About Us
Overview
CSR
Policies and Frameworks
Management
Awards
Sectors
Thermal
Renewable
Transmission & Distribution
Water Treatment
Sustainable Solutions
Services
Detail Engineering
Owner's Engineering
Independent / Lender's Engineering
Project Management Services
Special Engineering Services
Contact Us

Registered Office

L&T House
Ballard Estate P.O. Box 278 
Mumbai - 400 001 
Maharashtra, India   

Tel No.: +91-22-6752 5656 
Fax: +91-22-6752 5858 

Investors
Annual Reports
Technical Papers
Careers

Follow Us

  • Copyright & Terms
  • Privacy Policy

© 2026 L&T-Sargent & Lundy Limited. All rights reserved.

WATER TREATMENTWATER TREATMENT

375 MW Dhuvaran Phase III Combined Cycle Power Project
India

Name of Project : 375 MW Dhuvaran Phase III Combined Cycle Power Project, Gujarat, India

Owner : Gujarat State Electricity Corporation Limited (GSECL), India

Client : Larsen & Toubro Limited, India

Capacity : 375 MW

L&T-S&L’s scope : Complete Basic and Detail engineering for EPC of entire plant

Configuration : One (1) Siemens make Single Shaft Turbine Train  (SCC5 4000F SS)

Key Technical Features :

  • Natural circulation Vertical HRSG by L&T
  • Siemens SGT5-4000F Gas Turbine of capacity 245 MW
  • GT/ST common generator rated 471 MVA, 20 kV
  • Siemens SST5-3000 Steam Turbine of capacity 130 MW with two cylinder (HP,IP-LP) axial exhaust
  • STG auxiliaries like Boiler Feed Pumps (BFP), Condensate Extraction Pump (CEP), DM cooling water pumps, Vacuum pumps, Heat-exchangers etc.
  • By-Pass Deaerator and axial Condensers having divided water box
  • Single EOT capacity of 370 Tonne is installed in power block building – One of India’s largest single EOT crane in power plant
  • Balance of Plant including water system with RO facilities, HVAC, firefighting, fuel Gas system etc.
  • Generator transformer – 3 phase unit, 20/235 kV, 471 MVA one of the largest 3-phase generator transformers in India
  • Power evacuation by 220 kV outdoor switchyard – 2M+1T, 7 bays
  • Switchyard control and operation by SCADA
  • ETP-RO plant & Induced draft cooling tower by L&T
  • General Civil works for complete plant

Fuel :  Natural Gas

Year of commissioning : 2014