Name of Project : 1x500 MW CCPP & 1x330 MW SCPP John S. Rainey Generating Station at South Carolina, USA
Owner : Santee Cooper, USA
Client : General Electric International Inc./ Sargent & Lundy, USA
Capacity : 1x500 MW CCPP and 1x330 MW SCPP
L&T-S&L’s scope : Detail engineering services
Configuration :
- Two (2) GE make PG 7241FA Gas Turbines Generators (GTGs)
- Two (2) NEM Holland make Heat Recovery Steam Generators (HRSGs)
- One (1) GE make Steam Turbine Generators (STGs)
Key Technical Features :
- GTGs of 169 MW capacity each with dry low NOx burners for emission control
- HRSGs triple pressure, unfired, reheat, natural circulation type
- STGs of capacity 190 MW each having two (2) cylinder with combined HP / IP casing
- Two pass, single shell divided water box deaerating type condenser
Fuel : Natural Gas
Year of commissioning : 2001