Name of Project : 225 MW Sikalbaha Combined Cycle Power Project, Bangladesh
Owner : Bangladesh Power Development Board (BPDB)
Client : Larsen & Toubro Limited, India
Capacity : 225 MW
L&T-S&L’s scope :
- Complete Basic and Detail Engineering
- Site Support Services
Configuration :
- One (1) Siemens make SGT 5 2000E Gas Turbines Generators (GTGs)
- One (1) L&T make Heat Recovery Steam Generators (HRSG)
- One (1) Siemens make Steam Turbine Generator(STG)
Key Technical Features :
- GTGs of capacity 172 MW ISO , using natural gas as primary fuel and Diesel as second fuel
- HRSGs having dual pressure, natural circulation
- Axial Flow STG, capacity 85 MW
- Two pass, single shell Axial Condenser
- Single phase transformer for both GTG and STG
- 50m tall Gas Turbine Bypass stack
Fuel : Natural Gas and Diesel oil, LPG as start up fuel
Year of commissioning : 2017