Name of Project : 2x500 MW CCPP Fairless Energy Facility at Pennsylvania, U.S.A
Owner : Dominion Energy, USA
Client : General Electric International Inc./ Sargent & Lundy, USA
Capacity : 2x500 MW
L&T-S&L’s scope : Detail engineering services
Configuration :
- Two (2) GE make PG7241FA Gas Turbines Generators (GTGs)
- Two (2) NEM Holland make Heat Recovery Steam Generators (HRSGs)
- One (1) GE make Steam Turbine Generators (STG)
Key Technical Features :
- GTGs of 169 MW capacity each with dry low NOx burners for emission control
- HRSGs triple pressure, unfired, reheat, natural circulation type
- STG of capacity 193 MW each having two (2) cylinders with combined HP / IP casing
- Two pass, single shell divided water box deaerating type condenser
Fuel : Natural Gas
Year of commissioning : 2004