Name of Project : 360 MW Bheramara Combined Cycle Power Project, Bangladesh
Owner : North West Power Generation Co. Ltd (NWPGCL), Bangladesh
Client : Larsen & Toubro Limited, India / Marubeni, Japan
Capacity : 360 MW
L&T-S&L’s scope :
- Complete Basic and Detail Engineering
- Site Support Services
Configuration :
- One Gas Turbine M 701F4
- One MHPS Steam Turbine SRT 35.4
- One CMI/L&T Heat Recovery Steam Generator (HRSG)
Key Technical Features :
- CW forebay extended inside the Cooling tower basin
- High capacity (@ 170 M3/ Hr) Deep well water pumps for 3 COC
- Gas Booster Compressors in Fuel Gas Supply chain
- Deaerator working without pegging steam at Full load
- Combine Cycle Project without a GCB
Fuel : Natural Gas
Year of commissioning : 2017