Name of Project : 4000 MW Qurayyah Independent Power Project, Kingdom of Saudi Arabia
Owner : Hajr Electricity Production Company (HAJR), Kingdom of Saudi Arabia
Client : Samsung C& T, S Korea /Sargent Lundy, USA
Capacity : 4000 MW
L&T-S&L’s scope : Part Basic and Complete Detail Engineering Services
Configuration :
- Twelve (12) Siemens make Gas Turbines Generators (GTGs)
- Twelve (12) BHI make Heat Recovery Steam Generators (HRSGs)
- Six (6) Siemens make Steam Turbine Generators (STGs)
Key Technical Features :
- Two (2) Units each unit having Three (3) Blocks of side-by-side 2x2x1 arrangement
- Dual fuel, Dry Low NOx GTGs SGT6-5000F of 229 MW rating each
- Two (2) pressure level condensing STGs of 226 MW rating each
- Horizontal HRSGs without duct firing at two pressure levels
- Bypass Deaerator
- Sea water intake system and Cooling system
- Electrochlorination system
- Desalination plant for sea water
- Turbine inlet chilling system
- Plant HVAC & Firefighting system
Fuel :
- Primary Fuel: Natural Gas
- Back-up fuel: Diesel
Year of commissioning : 2014