• L&T-Sargent & Lundy
  • L&T-Sargent & Lundy

585 MW CCPP Sohar Power and Desalination Plant, Oman



  •  

    Name of Project : 585 MW CCPP Sohar Power and Desalination Plant, Oman

    Owner : Sohar Global Contracting & Construction Co, Oman

    Client : Doosan Heavy Industries and Construction Co. Limited, Korea

    Capacity : 585 MW

    L&T-S&L’s scope : 

    • Detailed engineering services (C&I)
    • Power System Study
    • Commissioning and Testing Manuals
    • Performance Test Procedures
    • Site Support

    Configuration :

    • Three (3) Siemens make V94.2 Gas Turbine Generators (GTGs)
    • Three (3) Doosan make Heat Recovery Steam Generators (HRSGs)
    • One (1) Alstom make Steam Turbine Generator (STG)

    Key Technical Features :

    • Dual fired GTG of capacity 139 MW each
    • STG of capacity 220 MW each
    • 33 MIGD integrated desalination plant

    Fuel : Natural Gas

    Year of commissioning : 2008