Name of Project : 750 MW Sabiya - 1 CCPP Project (500 MW SCPP+ 250 MW conversion), Kuwait
Owner : Ministry of Electricity & Water (MEW)
Client : Alghanim International General Trading & Contracting Co. WLL, Kuwait
Capacity : 750 MW
L&T-S&L’s scope : Basic & Detail engineering services including On Site Support for EPC of the entire plant
Configuration : Combined cycle plant of
- Two (2) nos. Siemens 4000F Gas Turbines
- Two(2) nos. unfired HRSG
- One (1) GE STF30 Steam turbine generator
Key Technical Features :
- Two GTGs of capacity 261.85 MW
- One Steam Turbine Generator of Capacity 250MW
- Sea water cooling tower with intake & outfall arrangement
- Closed cooling water system including emergency cooling system
- Feed water system including LP economizer circulation system
- Condensate system
- Conventional Chlorination Plant (3 x 50%)
- Compressed Air System (3 x 50%)
- Chemical Storage, Forwarding & Dosing System
- Waste Water Neutralization Plant
- Plant Nitrogen Purging & Preservation System
- Fire Protection system
- BMS controlled HVAC Plant including smoke management
- Design with wet compression feature
Fuel : Natural Gas & Fuel Oil
Year of commissioning : 2018